Migrating to SunRav TestOfficePro: Step-by-Step Guide for IT Teams
SunRav TestOfficePro: Complete Setup & First-Time Checklist
1. System requirements (minimum)
- OS: Windows 10 (64-bit) or later / macOS 11.0 or later
- CPU: Dual-core 2.5 GHz or faster
- RAM: 8 GB (16 GB recommended)
- Disk: 5 GB free for application + 10 GB for projects/logs
- Network: Stable broadband (for license activation, updates, cloud sync)
- Permissions: Administrator rights for install; firewall allowed for program and updater
2. Pre-install preparation
- Backup existing projects: Export or copy any current project files that might conflict.
- Check license & credentials: Ensure you have the license key, admin user account, and any SSO/OAuth info.
- Disable conflicting software temporarily: Antivirus or aggressive endpoint tools can block installer actions—plan to whitelist if needed.
- Confirm network access: Port 443 and the domain(s) listed in your vendor docs should be reachable.
- Gather runtime dependencies: If your deployment uses database or messaging (e.g., PostgreSQL, Redis), ensure version compatibility.
3. Installation steps
- Download installer: Get the latest installer from the official distribution point.
- Verify checksum: Confirm the file integrity (SHA256) to avoid corrupted installs.
- Run installer as admin: Follow prompts; choose “Typical” for single-machine and “Custom” for server/enterprise options.
- Select installation directory: Prefer a stable path (avoid user temp folders).
- Install prerequisites: If prompted, allow .NET runtime (Windows) or necessary runtimes on macOS.
- Complete installation and restart (if required).
4. Initial configuration
- Launch TestOfficePro: Sign in with the admin account and activate your license.
- Set global preferences: Timezone, default project folder, autosave interval, and update settings.
- Configure user roles: Create admin(s), project managers, and testers with appropriate permissions.
- Integrate with directory/SSO: Connect to LDAP/Active Directory or SSO provider if required.
- Connect external services: Link issue trackers (Jira), CI systems, and notification channels (email, Slack).
- Set up backups: Schedule automated backups of config and project data.
5. Project onboarding checklist (first project)
- Create project: Define name, key, type (functional / performance), and retention policy.
- Import test assets: Upload or import existing test suites, scripts, or templates.
- Configure environments: Add test environments (staging, QA), with target endpoints and credentials stored securely.
- Define test schedules: Set daily/weekly runs and assign owners.
- Set alerts & thresholds: Define pass/fail conditions, performance thresholds, and notification rules.
- Run a smoke test: Execute a small suite to validate connectivity, permissions, and basic functionality.
6. Post-install verification tests
- License activation check: Confirm license expiry and concurrent-seat count.
- User login: Test logins for admin and non-admin users.
- Project creation and deletion: Verify lifecycle actions.
- External integrations: Trigger a test issue creation in Jira and send a
Leave a Reply